Building regulations make sure a building is safe, sound and energy efficient. In Northern Ireland they’re checked by the Building Control team at your local council. The good news is that most conservatories are exempt. Here’s how to tell.
When a conservatory is usually exempt
A conservatory is generally exempt from building regulations when all of these are true:
- it’s built at ground level;
- its floor area is under 30 square metres;
- it’s separated from the house by external-quality walls, doors or windows (so the old back door or patio doors stay in place);
- it has its own heating, with its own controls, rather than an extension of your central heating;
- the glazing and any electrical work meet the relevant safety rules (glass in doors and low panels must be safety glass).
When you will need Building Control approval
You’ll need approval if any of those conditions aren’t met. The most common reasons are:
- Opening it up to the house. Taking out the back door or wall to make an open-plan room turns the conservatory into an extension, so it needs to meet the energy rules for the rest of the house.
- A solid or tiled roof. Replacing a glass or polycarbonate roof with a solid one changes the structure and insulation, and normally needs approval.
- A bigger room. Over 30 square metres.
- Adding it to your central heating.
Orangeries usually need approval too, because of their solid perimeter roof.
Why it matters
Building work that needed approval and didn’t get it can cause problems when you sell your house: a buyer’s solicitor will ask for the completion certificate. Without it, you may have to apply retrospectively, open up finished work for inspection or make changes.
Electrics and glass still have to be right
Even an exempt conservatory must be safe. Electrical work should be done by a qualified electrician and certified, and glass in doors and low-level panels must be toughened or laminated safety glass.
How we help
We’ll tell you at the design visit whether your conservatory is likely to need approval. If it does, we prepare the drawings and calculations, submit them to your council’s Building Control team, arrange inspections during the build and make sure you get your completion certificate. The rules here are a general guide: Building Control at your council confirms what applies to your project.